Home / BBNBNSB24 Flush Mount Instructions

BBNBNSB24 Flush Mount Instructions

BBNBNSB24 Flush Mount Instructions


NOTE: Recessed installation at frame stage only

Step 1

Prepare enclosure for installation by removing all un-required parts, gear tray, door frame, escutcheon, wall plate brackets.


Step 2

Use 2 x self tapping screws and fix the Mechanical protection plate to the top of enclosure. This will stop potential rear damage to cables


Step 3

Fit mounting box between studs and fix back with screws -Ensure Mounting box is level


Step 4

Mark plans and take note of mounting box location


Step 5

Knockout required cable entries, bush with supplied bushes and bring the cables into the enclosure


Step 6

If a Fibre conduit is present, it can be run into the enclosure using the far right knockout and down to the bottom of the electrical section where the fibre can be dropped behind the gear tray.


Step 7

Once the wall has been lined, cut-out the mounting box along the inside edge of enclosure


Step 8

Re-install gear tray with 4 x screws


Step 9

Optional – Separate the door from the door frame by removing the three pins from the hinges


Step 10

Fit and push back the frame so it is flush with lining. Secure with 4 x self drilling screws in the pilot holes


Step 11

Ensure clearance from the hinge side door edge to wall to prevent any rubbing when opening and closing. If rubbing occurs the frame hinge position may need to be adjusted slightly.