Home / BBNBNV1 Surface Mount Instructions

BBNBNV1 Surface Mount Instructions

BBNBNV1 Surface Mount Instructions

1. Remove wall plates mounting box from inside enclosure.

2. Mark fixing points and install wall plugs

3. Feed cables into enclosure – keeping the power cable to the far right in the segregated power location.

4. Screw back enclosure to wall plugs.

5. Re-install mounting box.

6. Connect power point and earth cable (located behind power point) ENCLOSURE MUST BE EARTHED and all power connections shall be done by a licenced electrician ONLY.

7. Connect phone and data connections.

8. Mount NBN Co hardware in labelled locations only.